1.1 PERMANENT ELECTRICITY AND/OR WATER CONNECTION FOR NEW OR EXTENSION PROJECTS
|
 |
1.1.1 Obtain DEWA's NOC for Building Permit |
Top |
| # |
Procedure
to follow |
Place to
contact |
| 1 |
Apply
for enrollment through DEWA website www.dewa.gov.ae
along with the following:
1.Copy of Trade License. |
DEWA website: E-Services
Building NOC Enrollment
|
| 2 |
Apply for building
NOC through web application along with the
following attachments:
1.Copy of Affection Plan to original scale
2.Copy of site setting out plan showing details
of proposed works, meter location(s), overhead
tanks, etc. |
|
 |
 |
1.1.2 Obtain DEWA's approval for Electricity LV wiring installation |
Top |
| # |
Procedure
to follow |
Place to
contact |
| 1 |
Take the prescribed
application form for Drawing Approval |
Technical Office
|
| 2 |
Complete the Application
Form and submit for approval, the drawings
in the standard formats specified in Clause
1.7 of DEWA Regulations for Electrical Installations
supported by the following:
1. Copy of Building Permit "NOC"
2. Site setting out layout/key plan
3. Connected Load & Maximum demand Schedules
4. Single line diagram
5. Dimensional layout of electrical switch
rooms/metering enclosures
6. Wiring layouts
7. Load distribution schedules
8. Plan of substation location (if requirement
of substation is indicated in DEWA's Building
Permit "NOC")
9. Other drawings/technical specifications,
as applicable
|
| 3 |
Collect the drawings
duly approved or commented, as informed through
telephone/SMS message |
| 4 |
Applications returned
requiring compliance should be resubmitted,
duly complied with as per the revised delivery |
|
 |
 |
1.1.3
New Connection Registration |
Top |
Note:- No request for release of Electricity and/or Water supply
for permanent installation shall be accepted by DEWA, without completion certificate/permission from
Dubai Municipality/applicable utilities
 |
1.1.4 Estimate for provision of DEWA's service and payment |
Top |
| # |
Procedure
to follow |
Place to
contact |
| 1 |
The applicant will
receive DEWA's estimate by mail or fax, after
site survey and technical review
|
Technical Office
|
| 2 |
Collect the demand
note on receipt/collection of estimate. |
| 3 |
Pay the specified
amount, submitting there with the original
demand note and the account number allotted
by the Customer Services Department, and collect
the receipt |
Cash Counter
|
Note:- Contact DEWA, on Tel: 307-2207 for any
clarification or coordination required for the site survey.
 |
1.1.5 Coordinate for inspection and testing of customer installation |
Top |
On completion of the construction works at the site, coordinate with DEWA for inspection and installations as per the following procedure:
|
|
|