Frequently Asked Questions

Shams Dubai - General

What are photovoltaic (solar) systems or "PV"?

A photovoltaic (PV) system uses PV cells to convert sunlight into electricity. PV cells are made of semiconductors and are used to assemble PV modules: the components used in PV systems. A great advantage of PV systems is that they are fully scalable and vary in size according to the local energy needs, so they can be used for residential, commercial and industrial electricity supply. There are two main types of PV systems: grid-connected and stand-alone.

A grid-connected PV system is connected to the existing electricity grid. The electricity produced by the system can be used to feed local loads and the surplus is delivered to the electricity grid. This type of system is our main focus, as DEWA Distributed Solar Program deals with PV systems connected to DEWA electricity grid.

Off-Grid PV systems are not connected to the grid and are designed to use the electricity produced by the PV exclusively in your own residence or facility.

In all cases the energy produced by the PV modules is converted from DC to AC by an Inverter, either for your own use or for export to the DEWA network.

What are the benefits of installing solar panels for home and business owners?

Using solar energy produces no air or water pollution and no greenhouse gases emissions. Solar power offers benefits to both homeowners and businesses:

  • Reduces electricity bills - installing a solar PV system requires you to undertake an initial investment, but – due to the electricity generated locally – allows you to reduce your electricity bills over lifetime of the system (25 years and beyond for a well maintained installation);
  • Increases the value of your property – should you decide one day to sell or rent out your property, it will likely attract a higher price or rent in the market if a PV system is installed. In fact, the new owner will enjoy lower electricity bills due to the electricity generated locally;
  • Reduces your carbon footprint - Your carbon dioxide footprint is a measure of how much carbon dioxide you're releasing into the environment based on your energy-consuming habits. By using solar energy, you will be able to reduce or even erase your carbon footprint;
  • Supports Dubai’s economy and ensure its sustainable future. Solar power is locally produced. Every kWh of solar energy that we produce in Dubai reduces our demand for electricity.


How does our society collectively benefit from this?

Solar energy is a form of renewable energy which is clean, secure, and limitless. It produces no emissions and does not affect the environment.

Using renewable energy reduces our reliance on diminishing traditional sources of energy, such as gas, oil and coal, ensuring sustainability for future generations.

Renewable energy is a key factor in Dubai’s efforts to foster economic, and social growth while preserving the environment.

In 2011, the Dubai Supreme Energy Council formulated the Dubai Integrated Energy Strategy 2030, which requires renewable electricity sources to contribute to 15% of Dubai power needs. The launch of Mohammed bin Rashid Al Maktoum Solar Park is the first milestone in the path to achieving this vision. The production and use of solar energy by Dubai citizens, businesses and industries will also contribute to this vision becoming a reality.

What is the investment cost and break down (equipment, installation, connection and maintenance fee)?

Unfortunately, there is no single or simple answer. Cost depends on a number of factors, such as whether the system is stand-alone or is integrated into the building design, the size of the system, and the system manufacturer, retailer, and installer.

It can be roughly said that the PV modules make up between 30-50% of the total installation costs. Annual maintenance fees are in the range of 0.5-1% of the installation costs. Connection fees are typically a small share of the total cost.

Are any incentives being provided?

Dubai is applying a Net Metering scheme. In this case you can produce your own electricity and consume it directly. If more electricity is produced than consumed, it can be injected into the DEWA distribution network. This surplus energy will be credited and used to off-set future consumption of electricity. The incentive is therefore the savings on the electricity bill, as you will be purchasing less electricity from DEWA in order to meet your needs

Are there any tax incentives available for commercial or industrial enterprises for installing solar panels?

No tax or other incentives are currently being offered.

What is the estimated return on investment and saving for a residential, commercial, or industrial properties?

The investment return and savings depend on how much electricity you currently use, and the tariff you are paying (see DEWA tariff slabs, and how much electricity the photovoltaic system will produce. In general it can be said that the business case for clients with larger consumption and the possibility to install bigger systems is currently more attractive than for clients with low consumption and smaller systems.

You can ask your photovoltaic system provider (see list of enrolled Electrical & DRRG Solar PV Consultants and Contractors) how much your new system will produce on an annual basis and compare that number to your annual electricity demand to get an idea of how much you will save.

Who is involved in the different steps needed to connect a Solar PV system?

DEWA
Customer
Consultant /Contractor
Equipment Manufacturer

Once you decide to install a Solar PV System, you will be advised to contact an enrolled Electrical & DRRG Solar PV Consultant or Contractor that will provide you with recommendations on the best possible solution for your property. You or your Consultant or Contractor may gather proposals from different equipment Manufacturer in order to source the required equipment. The Consultant or Contractor, acting as your agent, will gather all necessary information and documentation and initiate the online Application Process with DEWA.

If the Consultant does not have an in-house ability to construct and Install the Solar PV equipment, a Contractor will be hired for the construction and the installation of the equipment.

DEWA has an enrolment scheme for Consultants and Contractors based on a Solar PV Expert Certification in order to ensure a high standard of safety and efficiency. For more details and instructions please go to (Enroll as DRRG Solar PV Consultant/Contractor)

Please note that DEWA only provides the list of the enrolled Electrical & DRRG Solar PV Consultants and Contractors that have attended DEWA’s Solar PV Training Course and possess the necessary qualification and skill. However, DEWA will not be responsible for any professional or boundary advice or other professional technical guidance given by the Consultant/ Contractor or for any injuries, damage, loss, substandard designs, construction, building, installation, delays and for any negative consequences arising from the services delivered by the listed Consultants and Contractors.

In order for Manufacturers and Equipment Suppliers to have their equipment included in the DEWA list of eligible equipment, they must submit a formal request to DEWA. A thorough evaluation of all standards and certification documents will ensure equipment is compliant with DEWA regulations and will then be included in the DEWA list of eligible equipment. This process ensures that the equipment meets the required DEWA quality and safety standards. For more details and instructions please go to (PV Equipment Eligibility):

Please note that the information presented on the DEWA website provides an overview of the manufacturers and equipment that meet DEWA technical standards. However, this does not constitute an endorsement or warranty of any kind, whether express, implied or statutory, including but not limited to warranties of title, merchantability, satisfactory quality, fitness for particular purpose, warranty for performance, professional advice, professional financial guidance, and shall not be relied upon as the only source of information for purchasing, contracting, investment decisions or for executing other binding agreements. Please refer to the individual manufacturer / supplier listed to verify the quality, performance, availability, cost and reliability of their equipment.

The connection procedure consists of 4 different stages:

  1. The No Objection Certificate (NOC) stage
  2. The Design Approval stage
  3. The Inspection and Connection stage
  4. The Generation stage

Once you decide to invest in a Solar PV generator, it is recommended you hire a DEWA enrolled Electrical & DRRG Solar PV Consultant or Contractor (List of enrolled Solar PV Consultants & Contractors) that will act as your agent and will advise you on the best possible solution for your system.

During the first stage, the Consultant/Contractor will gather all necessary general information and will then submit the online PV connection application form (Apply for Solar PV Connection).

DEWA will carry out the application assessment and ensure all necessary documents have been submitted and all the criteria have been met. Upon successful completion of the assessment, DEWA will issue the No Objection Certificate (NOC).

In the second stage, your Consultant/Contractor should submit the online Application for Design Approval (Apply for Solar PV Connection). With this application a number of technical documents need to be submitted to DEWA, such as the site plans, system design plans and details of the proposed equipment, compliance with DEWA regulations.

Upon successful completion of the application assessment by DEWA, you will be informed of the connection fee. Once you have paid the connection fee, DEWA will begin the necessary network intervention in order to facilitate the connection process and you can begin the required construction and installation.

The third stage of the process begins once your PV equipment has been laid out. However, before you initiate any electrical work, your consultant/Contractor must perform Mechanical Completion with the concerned building Authority (i.e. Dubai Municipality, Trakhees) to insure the layout is compliant with all the applicable safety regulations. Once this is completed, you may proceed with the necessary electrical work and installations.

After all the electrical work has been finalised, you will now need to perform the online Notification for Electrical inspection and Testing (Apply for Solar PV Connection). in order to complete the inspection of your plant and to proceed with the Connection. With this notification, you will also be required to submit a number of certificates, a signed Connection Agreement between you and DEWA and a number of other documents. For details, kindly refer to (DEWA DRRG Connection Guidelines)

Once DEWA finalises the assessment, meters will be installed.

The final stage begins once DEWA has installed the meters and begin to consider the energy generated by your plant.

You will also be required to submit the signed Connection Agreement with DEWA, which sets out the net metering arrangement and the responsibilities of both parties.

In addition, you will be required to present a signed Operation and Maintenance Contract as well as the Operation and Maintenance Manual provided by your Consultant and / or Contractor. For more details please refer to (DEWA DRRG Connection Guidelines)

Snapshot of the Connection Process:

What equipment is needed?

A PV system is made up of different components. These include:

Solar Panels
Solar panels are the electricity-generating units of a Solar PV system. Most solar panels have a life cycle of up to 25 years, but in some cases this can be longer. They are usually guaranteed by the manufacturer for a certain portion of the lifespan and they undergo a loss of performance over time. Therefore, some minimum efficiency is typically guaranteed.

Inverter
The Inverter converts the DC electricity produced by the solar panels into an alternating current (AC) that can be used directly in the house or injected into the DEWA network.

The Inverter should be located in an airy, safe and accessible area and protected from direct solar radiation and water. Inverters typically have an efficiency above 95% and a general warrantee for 10 years.

Metering System
To measure the electricity generated by the renewable generation unit and electricity consumed in the premises, two energy meters must be installed:

The first meter supplied and installed by DEWA measures the power generated by the photovoltaic system.

The second meter supplied and installed by DEWA measures the power exported to DEWA grid and the power imported from DEWA grid. During the connection process, the renewable generation unit will be inspected by DEWA before the metering system can be installed. The inspection ensures that the generation unit complies with DEWA technical and safety regulations.

Interface protection
An automatic decoupling device (also called Interface Protection) should be installed between the inverter and the network connection point, if not yet incorporated in the inverter. This decoupling device stops the PV plant when a problem is detected on the network or when maintenance is needed. This prevents the current from being injected into the network or the electric loads within the premises when the electric power supply has been switched off for safety reasons.

Does DEWA have any guidelines relating to the technical specifications of the solar panels and other equipment?

Such specifications are included in the following documents:

- Standards for Distributed Renewable Resources Generators connected to the Distribution Network (Publications & Resources);

- Connection guidelines for Renewable Resources Generators connected to medium- and low-voltage distribution networks (Publications & Resources)

- The manufacturer should provide a certificate proving that their equipment is compliant with these requirements. This certification document will be requested by DEWA during the connection process. A list of eligible equipment can be found on DEWA Website (List of Eligible Equipment). The list is non exhaustive: you can opt for a manufacturer currently not included in the list as long as the following two conditions are met:

- The equipment must be compliant with DEWA standards - Proof of such compliance must be sent to DEWA based on the same requirements formulated in the manufacturer equipment eligibility process instructions (PV Equipment Eligibility).

Are there any basic criteria that determine whether a certain residential or business unit is suitable for the installation?

Solar panels have truly come a long way. As its popularity increases and installation costs are gradually reduced, a lot of homeowners and businesses nowadays are eager to benefit from this sustainable technology.

The roof orientation, shading and surface area will determine whether you can benefit from this technology as well as the type and size of equipment you require.

We advise you to contact a DEWA enrolled Electrical & DRRG Solar PV Consultant or Contractor that can evaluate your criteria and advise you on the best possible solution for your premises.

There are three factors to be considered when planning to install solar cells onto the building’s envelope:

  • Panels orientation to the sun
  • Panels inclination
  • Potential shadow

The favourable orientation for fixed solar cells in the United Arab Emirates throughout the year is south, and the optimal inclination is about 24 degrees. This typically allows an annual irradiation of about 2100 kWh/m2 for Dubai, when both direct and diffuse radiation are considered.

It is important that panels are kept clean and any deposit of dirt and dust is avoided, since these reduce sensibly the efficiency of the panels. Dubai is in a region prone to dust storms and its accumulation, therefore it is recommended that you clean the PV frequently.

Furthermore, it is advisable to avoid any shadow on the panels because this can cause a significant drop in performance, may damage the module.

A solar system is generally made up of modular components. This means that one can easily replace a malfunctioning component, and possibly extend the system in the future.

Where are the panels usually installed?

In urban environments such as Dubai, the solar panels are typically integrated in buildings rather than mounted on the ground. Panels are usually installed on the roof rather than on the building façade, to reduce the visual impact and ensure ease of access for cleaning and maintenance. However, PV systems can be blended into almost any imaginable structure. You might find PV being used outdoors for security lighting as well as in parking lot rooftops and bus station shelters.

Who will be responsible for maintaining the solar panels and related equipment once it is installed?

The maintenance of the system is the responsibility of the customer, who is required to have an operation and maintenance contract with a service provider. As part of the connection process, the customer must present a signed Operation and Maintenance Contract. It is required that the Operation and Maintenance Contract Service providers are enrolled as Electrical & DRRG Solar PV Consultant and Contractors

What is the cost of solar panel technology?

The cost of the system depends on the size as well as the type of system used. Please refer to the answer to question 4 “What is the investment cost breakdown (equipment, installation, connection and maintenance fee”.

Are there any additional costs other than equipment, installation and maintenance fees?

DEWA will charge a one-off connection fee as part of the connection process. No further specific charges will be added to future customer’s bills on an ongoing bases. For most installations, the one-off connection fee will simply equal the fixed amount charged by DEWA for each renewable generator connected to the grid. This amount is currently set at AED 1,500 for each renewable generator, and covers mainly the cost incurred by DEWA for the procurement and installation of the Solar PV generation check meter. For large installations (with size above 400 kW) some dedicated equipment might be needed for the proper integration of the renewable generator into DEWA distribution network. In this case, DEWA will charge the cost of such equipment as part of the connection fees. The need for such equipment, will be made known to the applicant in the early stages of the application process, so that the customer will be in a position to take an informed decision on whether to proceed with the project or not. An estimate of the connection fees will then be communicated to the customer in design approval stage.

Who bears the cost of the new meter?

The bi-directional smart meter measuring the electricity exported to and imported from DEWA electricity grid will be installed by DEWA without any additional cost to customers over the normal service charges.

The second meter, installed to measure the electricity generated by the PV system, will be charged by DEWA as part of the one-off connection fees.

Shams Dubai - Consultant and Contractors

My company is in the business of designing and installing solar PV systems. What should we know about equipment specifications and connection requirements? And how can we become a DEWA enrolled Electrical & DRRG Solar PV Consultant or Contractor?

For equipment specifications and connection technical requirements you can refer to the following documents on DEWA website Publications & Resources

The enrolment process is set out on DEWA website at the following link Enroll as DRRG Solar PV Consultant/Contractor

The application process to connect solar generators is set out on DEWA website at the following link Apply for Solar PV Connection

Why does DEWA require an enrolment process?

All companies that are involved in performing electrical activities and work need to be enrolled with DEWA. This process also aims to ensure that consultants and contractors have only qualified professionals engaged in solar PV related activities, thus ensuring both quality and safety.

Installing grid-connected Solar PV generators requires a rather advanced skill set and in order to ensure the highest level of safety and adherence to the required regulations and standards, it is important for these systems to be installed by professionals with adequate training and skills.

The enrolment Process will ensure that the Consultants and Contractors involved in the process have adequate skill and experience, thus providing a measure of protection for the public and for DEWA.

Are there any permits or approvals that I must obtain from other government bodies to complete the application process?

You will need a Building Permit from Dubai Municipality for the civil or structural part of the installation, and a Completion Certificate after the Municipality has inspected and completed its final checks. For buildings located in Free Zones, the competent Authority (e.g. Trakhees) should provide these documents.

How can my company apply for enrolment?

Consultant and Contractor companies will have to apply through DEWA e-services an enrolment request to be accepted as Electrical & DRRG Solar PV consultant or contractor.

Shams Dubai - Solar PV Expert Certification

What is the purpose of the Solar PV Expert Certification?

Installing and connecting Solar PV systems in the electricity Distribution Network is a complex task that has never before been carried out in Dubai. In order to ensure the highest level of safety and adherence to the required regulations and standards, it is important for these systems to be designed, constructed, installed and connected by professionals with adequate training and skills. Certification also provides a measure of protection to the Dubai public by giving them a credential for judging the competency of practitioners. It is not in any way intended to prevent qualified individuals from installing PV systems. It aims to ensure that individuals and companies involved in designing and connecting the Solar PV systems can perform this task in a safe and reliable manner, providing their clients with a high quality system that cannot compromise their safety and also the stability of the Dubai electricity network.

What are the steps of the Certification?

The figure below provides an overview of the DEWA Certification steps and process.



What does this certification process entail?

The certification process begins with the Training Application. During this stage, DEWA will check the Applicant’s credentials and determine whether the applicant is eligible for training. To be able to attend the training, the applicant needs to demonstrate the required minimum skill set. This ensures that the applicant has the right technical knowledge and experience to be able to follow the training.

Following the training, that consists of both classroom coursework and laboratory work, the Applicant will be required to take an exam.

Applicants that pass the exam will be provided with a Solar PV Expert Certificate. Depending on the amount of experience they have in installing Solar PV systems, the applicants will receive the certificate of either “Junior” or “Senior” PV Expert.

How long does the training last?

The training will last 5 days.

How much does the certification process cost?

The current training sessions are free of charge, however DEWA reserves the right to introduce an application fee for future training sessions.

Shams Dubai - Eligibility

Can only individuals apply for the certification or can also companies apply?

The training is aimed at individual professionals. Once they pass their examination, these professionals will receive the DEWA Solar PV Expert Certification.

Consultants and Contractors Companies should nominate their professionals and apply for their certification. Companies wishing to be enrolled with DEWA and to apply for the connection of Solar PV plants need to have certified professionals in their team. This will allow them to apply for Solar PV Connection on behalf of their clients. For more information regarding this, please go to: Enroll as DRRG Solar PV Consultant/Contractor

Are the Consultants and Contractors already enrolled with DEWA required to apply for the Certification?

Already enrolled DEWA Electrical Consultants/Contractors should submit to DEWA the Solar PV certificates of the individuals on their team in order to be eligible to apply for the installation of PV systems as Electrical & DRRG Solar PV Consultants and Contractors on behalf of their clients.

Consultants/Contractors that have not been enrolled through the DEWA website must first enroll with DEWA as Electrical Consultant and Contractor. Subsequently they will need to provide Solar PV certificates of the individuals on their team in order to be eligible to apply for the installation of PV systems on behalf of their clients.

For information regarding the enrollment process, please go to the following link: Enroll as DRRG Solar PV Consultant/Contractor

How can I nominate employees for the DEWA PV training?

Companies wishing to nominate their employees and apply for the DEWA Solar PV Expert Certification Training, kindly visit the following page:Upcoming training sessions

What information and/ or documentation do I need to submit with the application?

Nominated Applicants may have none or insufficient experience in installing Solar PV systems. As such, after the training they can obtain the title of “Junior” PV Experts. Later, when they gain the needed experience in installing Solar PV systems, they will receive the qualification of “Senior” PV Experts.

However, applicants with sufficient experience in installing Solar PV systems may obtain the qualification of “Senior” PV Experts upon completion of the training and the examination.

Shams Dubai - Training

When does the training take place?

The first training took place in December 2014. The training will be repeated at regular intervals in order to ensure fair access to all interested Consultants and Contractors. For more information regarding the training, including additional timings, kindly visit the following link: Upcoming training sessions

How long does the training last?

The training duration: 3 – 5 days.

Who are the trainers?

The training is administered by DEWA and/or external consultants appointed by DEWA.

Where does the training take place?

This will be confirmed and published in DEWA website Upcoming training sessions according to the number of registered and accepted participants.

What is the content of the training?

The training comprises of both classroom course work and practice work. The content includes both technical aspects relating to the Solar PV installation process as well as safety issues. For more information please go to the following link: LINK

Will my nominated professional need further training after receiving the certification?

DEWA Solar PV Certification will be issued for a limited period of time. After the expiration of the validity of the Certificate, or soon before, your nominated professional will be required to attend a refresher course and re-sit the examination.

This process ensures that all Certificate holders are familiar with the latest technological advances, new regulations and other issues that may impact their work.

WHAT WILL HAPPEN AFTER COMPLETING THE TRAINING?

Who issues the Certificate?

DEWA will issue the certificate to professionals that have gone through adequate training, passed the required examination and meet all other requirements.

What benefit does the Certification provide to me?

Certification will provide you with a number of benefits. First of all, the certification will enable your company to enroll as Electrical & DRRG Solar PV Contractor/ Consultant which will ensure that your company can benefit from this growing demand. It will set you apart from the competition by broadening your expertise. This will allow you to perform the design, construction, building, installation, testing and the commissioning of a Solar PV plant in Dubai. As the grid connected Solar PV market expands, there will be a growing demand for this particular skill set.

In the long term, DEWA Solar PV training will be developed in line with the ISO/IEC 17024 standard. This will ensure that the Certification will be recognized worldwide.

Is this certification valid in other countries too?

At present, DEWA Solar PV Expert Certification will only be valid in Dubai. However, DEWA is in the process of developing a wider training and certification scheme, which will provide the required capacity to meet the growing market demand for certification. In addition, DEWA will also ensure that through the adoption of ISO/ IEC 17024 standards, these certificates are recognized worldwide.

Is the training in line with relevant International Standards such as the ISO/ IEC 17024?

At present, the training is not ISO/ IEC 17024 accredited. However, the training has been developed according to similar ISO/ IEC 17024 accredited programs. This does not only ensure the high quality of the training program, but will reduce the time required for the training to be ISO/ IEC 17024 accredited in the near future.

Shams Dubai - Equipment Manufacturers

My company imports solar panels to Dubai. What should we know about equipment specifications?

If you wish to have your equipment included in the DEWA list of eligible equipment, a formal request needs to be submitted to DEWA. A thorough evaluation of all standards and certification documents will ensure equipment is compliant with DEWA regulations and will then be included in the DEWA list of eligible equipment. This process ensures that the equipment meets the required DEWA quality and safety standards.

For more details and instructions please go to (Solar PV Equipment Eligibility)

You can also refer to the following documents on DEWA website (Publications & Resources)

If our company that manufacturers solar panels fails to obtain proof of the DEWA required Standards, can we continue selling and installing this technology in Dubai?

Not for systems to be connected to the DEWA electricity grid. Should you wish to install such grid-connected systems, your company needs to have proof of compliance to DEWA standards . Please refer to Equipment Eligibility details at the following link (Solar PV Equipment Eligibility)

AL Namoos-Getting Electricity

What is Al Namoos-Getting Electricity means?

Al Namoos taken from the Emirati dialect means ‘those who win races.
This is an enhanced process for providing fast track power supply connection to the customers.

What is the advantage of Al Namoos-Getting Electricity application for power supply connection?


You will be able to receive the power supply connection within 10 days(in two steps) for the projects connected load up to 150 KW under this category without any advance payment & security deposit.

Is there any additional charges for the process under Al Namoos-Getting Electricity application for power connection?

No. There is no additional charges. This service is free of cost. 

Is there any advance payment for DEWA’s external works under Al Namoos-Getting Electricity application for power connection?

No. There is no advance payment required. Upon power supply connection, the connection charges for DEWA’s external works are debited to the consumer consumption bill, based on normal fixed kW rate as per load applied.

Is there any requirement of Security deposits for Al Namoos-Getting Electricity application for power connection?

No. Security deposit is not applicable for Al Namoos projects. 

Is there any permit require by DEWA for carry out external works?

No. There is no permit require by DEWA for completing the external works. The requirement of excavation permit is removed as per the agreement between RTA and DEWA by using online “Instant Infrastructure Information”.

What specific care do I have to follow while filling in the Application?

All mandatory fields must be filled in (the mandatory fields are either in red or marked with an ( asterisk *)
Enter only numeric values in numeric fields (e.g. Maximum demand Load).
Enter only characters in character fields such as NAME.


Are any attachments required while submitting an application?

The attachments to be uploaded online are depending on the type of connection you selected and DEWA NOC condition and category.


What type of file extensions I can upload?

The file extensions as follows:

Drawings in DWF, DWG, Load schedules in PDF and other documents in .xls / .doc

How will I know if there are data entry errors for my submitted application?

Error messages will appear before the form can be submitted.

What happens to my application after I successfully submit it?

Once you submitted the application successfully the system will generate an application reference and this can be used for future interaction with DEWA. An e-mail and SMS, notification will sent to you with application reference.

Q) How do I notify for LV Inspection & Release of Supply?

There is no separate application required for LV Inspection &Release of supply. You are able to initiate for LV technical inspection upon readiness of the works, in line with DEWA technical safety requirements by tracking your application for Getting Electricity.


What can I do if I face problems in submitting my application, or I did not receive any e-mail notification?

In case of any query, you can contact DEWA’s Technical Enquiry Desk on phone (04-322 9999), Fax (04-322 9094), e-mail ( dp.enquiries@dewa.gov.ae ) and discussion through video conferencing system.

The contact information of the department is available under ‘Contact Us’ link at the bottom of the page.

KW Slab Unit Rate Connection Cost (Electricity)

FAQs for KW Slab Unit Rate Connection Charges

1. What is the slab unit rate system?

It is new connection charges for getting electricity based on total connected load.
There are 14 slabs with a range of load and per KW rate for each slab.

2. How does KW slab rate differ from the previous estimation system?

Our previous estimate system was based on materials and its labour cost.
But KW rate is based on approved total connected load.   

3. Is the rate applicable for all types of loads?

It applies for all permanent connection loads (except remote/unplanned areas, street lighting, and temporary supply for events)

4. What is the difference between the new slab unit rate system and the fixed rate per KW introduced earlier by DEWA?

Fixed rate system introduced earlier was for loads up to 400KW with ranges from
1-170kw (250aed/kw) and 171-400kw (290aed/kw). If the load exceeds the first range of 170kw, then the full load will be multiplied by 290aed/kw.
But in the new slab rate system every slab rate is separate and the summation of each slab will give the total cost.   

5. Is this new system applicable for projects submitted to DEWA prior to 01/01/2017?

All new connection cost released after 01/01/2017 will be as per new slab rate system. 

6. Is there a specific time period to fulfil the payment?

One year is the validity period.

7. Is the new system applicable for all types of projects?

Yes. It is applicable for all permanent connection projects (except remote/unplanned areas, street lighting, and temporary supply for events)

8. Is there any additional charges to be made for getting electricity other than the slab unit rate connection charges?

In addition to the slab rate charges, innovation fees +knowledge fees=20aed as existing at present will continue.

9. Is there any debit advice for KW cases?

There will be no debit advice, since KW is charged based on the total connected load.

10. What if I have existing load within my plot? Will this affect the KW cost?

The KW slab unit rate connection charges is based on existing and proposed load. The slab will start based on the existing load but only proposed load will be charged.  


11. Is there any mechanism to calculate the electricity connection charges for our project in advance for budgetary purpose?

There is a calculator on DEWA’s website and our Smart App for easy estimation and calculation
https://www.dewa.gov.ae/en/consultants-and-contractors/services/connection-services/new-connection-calculator

12. What if I decided to lay the HV cable by my DEWA approved contractor? How this will affect the KW Slab unit rate connection cost?

Cable laying charges will be deducted as per actuals from the KW Slab rate Connection Cost regardless of payment

 

Building NOC

Who can submit Building NOC application?

Enrolled Consultant and Contractor only

How can I submit a Building NOC application?

You can submit through both of Dubai Municipality & DEWA system

To request for this service, visit the 'Building NOC’ page.

What type of Building NOC application can I submit?

You can submit a Building NOC application for “Electricity” or “Water”.

Are any attachments required while submitting a Building NOC application?

Yes: site plan (Affection plan) issued by the competent Authority, setting out plan, load confirmation letter for Major projects area etc.


Note: try not to attach files that are large in size.

What file extensions can I attach?

The file extensions you are allowed to attach are:

doc, gif, jpg, jpeg, pdf, tiff, zip, DOC, GIF, JPG, JPEG, PDF, TIFF, ZIP 

What rules do I have to follow while filling in the Building NOC application?

Required fields must be filled in (required fields are either in red or marked with an asterisk *).

Enter only numeric values in numeric fields (e.g. P.O.Box)

Enter only characters in some fields such as NAME and TYPE OF PROJECT.

How will I know if there are data entry errors for my submitted Building NOC application?

Error messages will appear before the application form can be submitted.

What happens to my Building NOC application after I successfully submit it?

The Building NOC application will go to the respective Department concerned. The application will then be processed accordingly.

How do I track the status of my submitted Building NOC application?

To track your Building NOC application, login to Building NOC Service and then choose from the main menu “Track Submitted Building Permit NOC Status”.
       

Will the Building NOC application be approved directly?

Before the Building NOC application is approved or rejected, it must first be processed by the concerned department. Accordingly, the department might APPROVE or REJECT the application.

What are Incomplete Building NOC applications?

Incomplete Building NOC applications are ones which have to be revised by you and that has errors.

How can I revise the Incomplete Building NOC applications?

To revise Incomplete Building NOC applications, login to Building NOC Service, and then choose from the main menu “Revise Incomplete Building Permit NOC Applications”.
   

Can I submit a Building NOC manually?

No. Online submission only.

Is the Building NOC eService free of charge?

Yes, the Building NOC eService is provided free of charge.

Demolition NOC

Who can submit Demolition NOC application?

Enrolled Contractor only 

How can I submit a Demolition NOC application?

To request this service, visit the 'Demolition NOC’ page.

What type of Demolition NOC application can I submit?

You can submit a Demolition NOC application for “Electricity” or “Water”.

Are any attachments required while submitting a Demolition NOC application?

You shall attach a Copy of DEWA Billing Services Department Clearance Certificate (DRS), site plan (Affection plan) issued by the competent Authority and a Copy of the Site setting out plan clearly highlighting the proposed Demolition area.

Note: try not to attach files that are large in size.

What file extensions can I attach?

The file extensions you are allowed to attach are:

doc,pdf, zip, gif or jpg

What rules do I have to follow while filling in the Demolition NOC application?

- Required fields must be filled in (required fields are either in red or marked with an asterisk *).

- Enter only characters in some fields such as NAME and TYPE OF PROJECT.

How will I know if there are data entry errors for my submitted Demolition NOC application?

Error messages will appear before the form can be submitted.

What happens to my Demolition NOC application after I successfully submit it?

The Demolition NOC application will go to the respective Department concerned. The application will then be processed accordingly.

How do I track the status of my submitted Demolition NOC application?

To track your Demolition NOC application, login to the Demolition NOC Service and then choose from the main menu “Track Submitted Demolition NOC Status”.

Will the Demolition NOC application be approved directly?

Before the Demolition NOC application is approved or rejected, it must first be processed by the concerned department. Accordingly, the department might APPROVE or REJECT the application.

What are Incomplete Demolition NOC applications?

Incomplete Demolition NOC applications are ones which have to be revised by you and that has errors.

How can I revise the Incomplete Demolition NOC applications?

To revise Incomplete Demolition NOC applications, login to Demolition NOC Service, and then choose from the main menu “Revise Incomplete Demolition NOC Applications”.

Can I submit a Demolition NOC manually?

No .Online submission only.

Is the Demolition NOC eService free of charge?

Yes, the Demolition NOC eService is provided free of charge.

Call Back Request

Why should someone apply for a Call Back Request?

This service allows you to request a call back incase you failed to approach your contact person in DEWA.

How can I submit a Call Back Request?

To request this service, visit the 'Request Call Back’ page.

Are any attachments required while submitting a Call Back Request?

No attachments required when you submit a Call back Request.

What rules do I have to follow while filling in the Call Back Request form?

  • Required fields must be filled in (required fields are either in red or marked with an asterisk *).
  • Enter only numeric values in numeric fields (e.g. P.O.Box)
  • Enter only characters in some fields such as NAME.


How will I know if there are data entry errors for my submitted application?

Error messages will appear before the form can be submitted.

What happens to my request after I successfully submit it?

The application will go to the respective Department concerned. The application will then be processed accordingly.

What are the alternative ways to apply for this service?

You can contact Customer Relations Department at DEWA Head Office.

Is the Call Back Request Service free of charge?

Yes, the Call Back Request Service is provided free of charge.
 

How can I get more information about the Call Back Request Service?

To get more information about this service, you can contact Customer Relations Department on 04-6019999.

Smart Services Registration

How can I register in DEWA Smart Services?

To register in DEWA's Smart Services, click here.

When I register, can I access to all DEWA’s Smart Services?

No, when you register, you will register either as a ‘Consultant/Contractor’ or a ‘Supplier’. Each type of user can access different Smart Services.
Smart Services available to ‘Consultant/Contractor’ are “Building NOC”, “Distribution Substation Inspection”, “Substation & LV Room Drawing Approval”, “LV Shop Drawing Approval” and “LV Inspection & Release of Supply”.
Smart Service available to ‘Supplier’ is “Local Purchase”.

What are important issues to consider while register?

You must have a valid trade license (i.e. not expired).

Can I choose any username and password while register?

You have to follow certain rules when choosing a username and password:

  • Username should be between 6-16 characters. Can contain only alphabets and numbers, e.g. abc123.
  • Username must be unique.
  • Password should be between 6-16 characters. Can contain alphabets, numbers and characters !@#$%, e.g. abc123$


What attachments are required for a register application?

Consultant/Contractor register:

  • Trade License document
  • Valid Passport & Visa copy of Engineer
  • Degree/Diploma Certificate
  • Experience Document
  • Authorization Letter
  • Valid trade license

What file extensions can I attach?

Consultant/Contractor enrollment:

  • Zip
  • Pdf


What rules do I have to follow while filling in the register application?

  • Required fields must be filled in (required fields are either in red or marked with an asterisk *).
  • Enter only numeric values in numeric fields (e.g. P.O.Box)
  • Enter only characters in some fields such as NAME.


How will I know if there are data entry errors for my submitted register application?

Error messages will appear to you before the form can be submitted.

DEWA Update Trade License

How will I know that my Trade License has been expired?

When your trade license is going to expire, you will get a notification message once you login to your smart service account.

What rules should I follow while filling the Update Trade License application?

  • Required field must be filled in (required field are either in red or marked with an asterisk * )
  • Trade expiry date must greater than today’s date.
  • Updated Trade License document should be attached


What file extensions can I attach?

Only PDF and ZIP file can be attached. 

What is the maximum size of attachment?

The attached document should be less than 4 Mega byte (4MB). 

How will I know if there are data entry errors for my submitted Update Trade License application?

Error messages will appear before the form can be submitted.

What happen to my Update Trade License application after submission?

The application will go to the respective department for document verification.

You will keep getting the expiry notification message until your new Trade License is approved. If you uploaded the updated Trade License,

you can ignore the expiry notification message and access your account normally by using ‘Main Application’ link. 

How can I know that my application is approved?

Upon approval, you will receive an e-mail notification.

What can I do if my application is rejected? 

Upon rejection, you will receive an e-mail notification with the rejection remarks. You can re-upload the document, or contact Customer Services Department for further information.

Infrastructure NOC Application


How can I submit an Infrastructure NOC application?

To request this service, visit the 'Infrastructure NOC Application’ page.

What type of Infrastructure NOC application can I submit?

You can submit any Infrastructure NOC for both manually submitted RTA E-NOC https://noc.rta.ae/ and NOCs which do not require RTA NOC reference number (DEWA related projects only).

Are any attachments required while submitting an Infrastructure NOC application?

Yes, all Infrastructure NOC applications require attachments based on NOC Type and Project Type. For attachment requirements, please use Infrastructure NOC Submission Guidelines which is available at https://crm.dewa.gov.ae/irj/portal/anonymous

What file extensions can I attach?

The file extensions you are allowed to attach are:

pdf, zip, dwg, dgn, rar

What rules do I have to follow while filling in the Infrastructure NOC application?

  • Required fields must be filled in (required fields are either in red or marked with an asterisk *).
  • Enter only numeric values in numeric fields (e.g. P.O.Box)
  • Project Number, Project description, Subject Description, Project Type, NOC Type, and DLTM Coordinates should be filled

How will I know if there are data entry errors for my submitted Infrastructure NOC application?

Error messages will appear before the form can be submitted.

What happens to my Infrastructure NOC application after I successfully submit it?

The Infrastructure NOC application will go to Infrastructure Information and Permits Department (II&PD). All acceptable NOC applications will be processed for Road Projects, Network Service Projects, General Projects, and House Connections Projects within the Right of Way, DEWA reservations and DEWA Premises (As applicable).

You will receive a confirmation message through SMS and an email upon successful submission with a DEWA reference number.

Any NOC application that is submitted through this portal as mentioned above will be Objected if such NOC is required to be submitted through RTA E-NOC portal as per law for working within the 'Right of Way'.

How do I track the status of my submitted Infrastructure NOC application?

To track your Infrastructure NOC application, login to Infrastructure NOC Service and then choose from the main menu “Track Your Applications”, select Infrastructure NOC Application option.

Will the Infrastructure NOC application be approved directly?

Before the Infrastructure NOC application is approved or objected, it will be processed by Infrastructure Information and Permits Department (II&PD) and on final stage will either be APPROVED or OBJECTED. In between processing if II&PD requires any clarification, technical comments will be sent (if required)

Which are Incomplete Infrastructure NOC applications?

Any NOC submission which is not as per DEWA Infrastructure NOC Submission Guidelines is considered as incomplete application.

For DEWA Submission Guidelines please refer to link https://crm.dewa.gov.ae/irj/portal/anonymous

How can I resubmit the commented Infrastructure NOC applications?

To resubmit commented Infrastructure NOC applications, login to Infrastructure NOC Service, and follow below step

Track Your Applications >> Select Infrastructure NOC Application option >> Search >> An edit button will appear in your application and you need to click that to resubmit the application.

Can I submit Infrastructure NOC manually?

No, all Infrastructure NOC applications are to be submitted digitally only (RTA system or DEWA Customer Portal) as applicable. If you face any difficulty while applying NOC, you can contact Infrastructure Information & Permits Department (II&PD) at the below address:-

Infrastructure Information & Permits Department

NOC Customer Service Center, Ground Floor, Administration Building, DEWA Al Warsan Office, Academic City Road, Dubai

Tel:- +971-4-3221612/3/4/5

Fax: - +971-4-3072239

Email: - TP.II&P@dewa.gov.ae

Is the Infrastructure NOC eService free of charge?

Yes, the Infrastructure NOC eService is provided free of charge.

How can I use Infrastructure NOC Customer Portal for NOC Submission / Resubmission?

Infrastructure NOC User Manual is available online at https://crm.dewa.gov.ae/irj/portal/anonymous which has been prepared with easiest way to use the portal

What publications are available for Infrastructure NOC Services?

Below documents are available for NOC Services

Infrastructure NOC Technical Manual

Infrastructure NOC Submission Guidelines

Infrastructure NOC User Manual

What is the expected reply time for each NOC?

The expected reply time for each NOC is as per below however, for special cases might take more depending on case.

Information NOC: 5 WD.

Trial pits NOC: 5 WD.

House Connection NOC: 5 WD.

General Projects and Networks NOC: 10 WD.

Road Projects NOC: 14WD.

PG Correspondence

How can access this service?

Those who have already register with Project-Generation DEWA can use this Service.

What can we attach?

PDF,XLS,DOC,DOCX or TIF' file types are allowed.

What is the size limit?

Total attachment size should not exceeds to 4 MB or 4096 KB. 

How can they access the Service?

Those who have already enrolled with Project-Generation DEWA can use this Service.

Technical Services for Infrastructure Projects


Which types of Applications can be submitted through Technical Services for Infrastructure Projects?

The following types of applications are available through this portal:

  1.  Completion Certificate
  2. As Built Approval
  3. BOQ approval Duct Installation
  4. Estimate for Cable Diversion Works
  5. Material  Sample & Specification Approval
  6. Request for Material specification 
  7. List of Approved Suppliers, Manufacture (Cable & Joints)
  8. Electrical Sub-Contractor Approval (Cable diversion work)

Is there any standard requirements to submit the above applications?

Yes. And it can be found in the customer guide lines of this service which is available online in DEWA portal or hard copy at Infrastructure NOC Counter in DEWA Warsan Complex ground floor.

How can I submit an application?

To submit an application, you must first login to the customer portal with your username and password. Once logged in, click on “Technical Service for infrastructure Projects (Link) from the main menu to submit a new application. In the Application Category Choose required application type.


Are any Attachments required while submitting an application through online submission?

Yes. The electronic attachments are mandatory as per DEWA requirement.

Please ensure the quality of all uploaded soft copy documents for clarity.


Which document’s format can be submitted?

The following file’s extensions you are allowed to attach:

pdf, doc, dgn, dwg, xls

What is the maximum size of documents can be uploaded through online submission?

The maximum allocated size through online submission should not exceed 100MB. (If exceeds kindly visit DEWA Warsan complex Ground Floor Infrastructure NOC Counter for manual submission).

How do I track the status of my submitted applications?

To track your application, Login in to the customer portal with your username and password and go to the Track your Application link. Furthermore applications status can be notified through the registered email and SMS on the registered mobile number.


How do I get appointment for meeting to discuss any issue related to above services?


You may contact the following DEWA Personals to get the appointment:

• Ameera Al Nuaimi: 04-3221280

• Afrah Almehiri: 04-3221610

Update User Profile and Information

How can I update my login profile and information?

Login to your account, then from the main menu, choose “Update Profile”.

Note: if you are a supplier, you have to wait for the Local Purchase Department in DEWA to approve the changes you requested.