Infrastructure Projects No Objection Certificate

Infrastructure Projects No Objection Certificate

Apply Online

Service Description

This service enables the registered Service Authority, Consultants, Contractors and Developers to request Infrastructure NOC for Road Projects, Network Service Projects, General Projects, House Connections and Building Projects Permit within Right Way (ROW)/ or within or adjacent to DEWA’s reservations / Premises before start of work through RTA E-NOC online system and/or availing through DEWA  as applicable.
The NOC types includes Design, Construction, Trail Trench, Service Information, Shop Drawing, and Design & Build



Service Category & Type

  • Subsidiary
  • Regulatory

Customer Segment

Infrastructure & Network Direct Customers:

  • Consultant
  • Contractor

Service Integrations

  • Applicable with E-NOC system with RTA

Service Partners

  • RTA

Package

  • N/A

Service Limitations

Automatic cancellation of the NOC application from RTA E-NOC system for the following cases:

  • The customer fails to obtain NOC approvals for the online and manual NOC submission within 60 days.
  • The customer does not make the RTA E-NOC application on DEWA Customer Portal, with the RTA-NOC application reference number, within 7 working days.
  • The validity of NOC is 6 months from the date of issue and to be renewed within 15 days before expiry.

Notes

Service Requirements

Mandatory Documents:
Depending on the project type and NOC application type, the NOC application should comply with the requirements of the Infrastructure NOC Submission Guideline and Infrastructure NOC Technical Manual; which can be found on DEWA portal.
 

Service Steps & Procedures

Work within right of way:

  • Apply for NOC online on the RTA system (e-NOC) through the link: (https://noc.rta.ae)
  • For online applications, customers should attach their requirements as mentioned in the NOC Submission Guidelines.
  • For manual application, get the online RTA reference number from e-NOC and upload the necessary documents on the DEWA Customer Portal at (https://crm.dewa.gov.ae/irj/portal/anonymous).

Work inside DEWA Reservations and Premises:

Service Fees

  • Free

Service Channels

Service Delivery Time

Service Name Delivery Time
Informational Services
Service Name
3 working days
Delivery Time
Trial Pits NOC
Service Name
3 working days
Delivery Time
House Conncection NOC
Service Name
3 working days
Delivery Time
General NOC
Service Name
5 working days
Delivery Time
 Dubai Building Permit System NOC (DBPS)
Service Name
 3 working days
Delivery Time
Network Projects NOC
Service Name
7 working days
Delivery Time
Road Projects NOC
Service Name
7 working days
Delivery Time

Journey Map