Use the toggle below to switch the contrast
Listen to the content of the page by clicking play on ReadSpeaker.
To discover more about accessibility view our
This service enables the registered Service Authority, Consultants, Contractors and Developers to request Infrastructure NOC for Road Projects, Network Service Projects, General Projects, House Connections and Building Projects Permit within Right Way (ROW)/ or within or adjacent to DEWA’s reservations / Premises before start of work through RTA E-NOC online system and/or availing through DEWA as applicable.
The NOC types includes Design, Construction, Trail Trench, Service Information, Shop Drawing, and Design & Build
Service Category & Type
Customer Segment
Infrastructure & Network Direct Customers:
Service Integrations
Service Partners
Package
Service Limitations
Automatic cancellation of the NOC application from RTA E-NOC system for the following cases:
Notes
Work within right of way
Work inside DEWA lands & premises
Service Name | Delivery Time |
---|---|
Information Services Service Name
|
3 working days Delivery Time
|
Trial Pits Service Name
|
3 working days Delivery Time
|
House Conncection NOC Service Name
|
3 working days Delivery Time
|
General NOC Service Name
|
5 working days Delivery Time
|
Dubai Building Permit System NOC (DBPS) Service Name
|
3 working days Delivery Time
|
NetworkNOC Service Name
|
7 working days Delivery Time
|
Road NOC Service Name
|
7 working days Delivery Time
|
This service presents different customer journeys based on specific scenarios:
How can I submit an Infrastructure NOC application?
To request this service, visit the ’Infrastructure NOC Application’ page.
What type of Infrastructure NOC application can I submit?
You can submit NOC’s that do not require RTA eNOC number and also NOC’s which are submitted in RTA eNOC system without attachments (Manual Version).
Are any attachments required while submitting an Infrastructure NOC application?
Yes, all Infrastructure NOC applications require attachments based on NOC Type and Project Type. For attachment requirements, please use Infrastructure NOC Submission Guidelines those are available on
DEWA portal
What file extensions can I attach?
Error messages will appear before the form can be submitted.
What happens to my Infrastructure NOC application after I successfully submit it?
The Infrastructure NOC application will go to Infrastructure Information and Permits Department (II&PD). All acceptable NOC applications will be processed for applicable Road Projects, Network Service Projects, General Projects, and House Connections Projects within the Right of Way, DEWA reservations and DEWA Premises (As applicable).
You will receive a confirmation message through SMS and an email upon successful submission with a DEWA reference number.
The service is dedicated specifically for project applications those require DEWA approval only e.g Shop Drawing, DEWA reservations and DEWA Premises, On Hold Areas in main applications
How do I track the status of my submitted Infrastructure NOC application?
Before any decision is taken on Infrastructure NOC application, it will be processed by Infrastructure Information and Permits Department (II&PD) and on final stage will either be APPROVED or OBJECTED. In between processing if II&PD requires any clarification, technical comments will be sent.
Which are Incomplete Infrastructure NOC applications?
Any NOC submission which is not as per DEWA Infrastructure NOC Submission Guidelines is considered as incomplete application. To avoid incomplete submission, please use Infrastructure NOC Submission Guidelines available on DEWA Portal.
How can I resubmit the Infrastructure NOC applications?
To resubmit an Infrastructure NOC application, follow the following steps:
Can I submit Infrastructure NOC manually?
No, all Infrastructure NOC applications are to be submitted digitally only (RTA ENOC system or DEWA Customer Portal) as applicable. If you face any difficulty while applying NOC, you can contact Infrastructure Information & Permits Department (II&PD) at the below address:-
Yes, the Infrastructure NOC is provided free of charge.
How can I use Infrastructure NOC Customer Portal for NOC Submission / Resubmission?
Infrastructure NOC User Manual is available on DEWA portal in an easy to use manner.
What publications are available for Infrastructure NOC Services?
Below documents are available for NOC Services
The expected reply time for each NOC is as per below however, for special cases might take more depending on case.
Dubai Electricity and Water Authority (DEWA) is committed to protecting the rights of the users of its website, and keeping data and information secure. We have created this privacy and security statement to explain the current information management practices on our websites.
Information Collection and Usage:
DEWA does not collect any personal information about you when you visit its website, unless specified, or you choose to provide this information to us. However, upon your visit, the following information is automatically collected and stored:
We may use third party tools or software for conducting statistical analysis. However, only certain pieces of aggregated, non-personal information, such as the number of users who accessed our website or most visited pages, are collected. Such information does not identify you individually.
DEWA keeps all collected information confidential except where disclosure is enforced or required by law, or as part of requirement to protect the rights or properties of DEWA.
Security of Transactions:
Please be assured that this site has security measures in place to protect the information you provide us. We use encryption methods to protect all information, which is deemed to be sensitive, or any other data that should remain secure to meet DEWA’s, federal, or local legal requirements.
Links to third-party websites:
DEWA's website may provide links to other web sites. However we are not responsible for the accuracy of the contents of these sites or their mechanisms for information collection and usage.
If you connect to any other site through DEWA’s website, you need to read its Security & Privacy Policy to determine its practices related to information collection and usage.
Security & Privacy Policy Changes:
DEWA reserves the right to change this Security & Privacy Policy at any time. The amended version of the Security & Privacy Policy will be always published only on DEWA's website.
Privacy intrusion:
If you doubt that your privacy is being compromised, follow these steps immediately:
What are Cookies?
Cookies are small text files that are stored in your device when you visit a website. DEWA uses cookies to improve your overall website experience.
How does DEWA use Cookies?
DEWA’s website cookies store website preferences like preferred language, font-size, or specific version (e.g. high-contrast). Once your preferences are set, you do not need to specify them again for DEWA’s site. DEWA also uses cookies for parts of the website that require registration to access content.
DEWA is committed to the protection of its customers’ private information and does not track individual users or their identity. DEWA only accesses the system information of the device, the website is being viewed on, to gain useful knowledge about how it is used. The collected information is used solely for statistical and monitoring purposes to help DEWA improve the user experience of the services and to identify the performance of DEWA’s services.
3rd Party Cookies:
DEWA also uses 3rd party tools or software, such as Google Analytics, to track web statistics. In this case, Google will place a 3rd party cookie on your computer. This is also the case with Google Maps across the site.
Any information collected by way of these cookies will be stored and managed by DEWA as per the approved DEWA Website and Mobile App Privacy Policy. If you don’t wish to store cookies for DEWA’s website, you can modify your browser so that it notifies you when cookies are sent, disable the cookies collection feature, or delete cookies that have already been set.
Disclaimer:
DEWA is not responsible for any technical, hardware or software failures of any kind; lost or unavailable network connections; incomplete, garbled or delayed transmissions. It assumes no liability for any direct, indirect, incidental, punitive, consequential or psychological damages as a result of visiting or using its Website or loss of services, income or welfare resulting from any virus that may infect computer equipment used to access its sites. Under no circumstances will DEWA be liable for any damages or injury that result from the use of the materials on this site and the user shall indemnify DEWA from and against all liabilities resulting from the user's failure to observe these terms and conditions. DEWA does not warrant that information currently accessible is up-to-date.